All municipalities

Building permit fee Súdwest-Fryslân 2026

For a renovation with construction costs of € 50 000 excluding VAT, Súdwest-Fryslân charges about € 506 for the technical building activity under its own fee regulation.

Fee per construction cost

Construction cost excl. VATBuilding activity fee
€ 10 000€ 103
€ 25 000€ 267
€ 50 000€ 506
€ 100 000€ 930
€ 250 000€ 2 052
€ 500 000€ 3 007

Rule in the regulation

a. indien de bouwkosten minder dan € 5.000 bedragen: € 48,20 b. indien de bouwkosten € 5.000 bedragen of meer, doch minder dan € 25.000: vermeerderd met € 5,46 voor elke € 500 of gedeelte daarvan boven € 5.000 € 48,20 c. Indien de bouwkosten € 25.000 bedragen of meer, doch minder dan € 50.000: verme

Source: Tarieventabel behorende bij de Legesverordening 2026, Artikel 2.5. read on 2026-10-13. Reliability: verified on the source.

If your plan also needs a check against the environment plan, a separate fee usually applies. The municipality sets the final amount in its decision; this page is not a decision of the municipality.

Skip or container on the street in Súdwest-Fryslân: permit needed?

Planning a renovation?

Describe your job in plain words. AstraNL structures the request and looks for an executor. There is no confirmed tradesperson or price for you yet.

Ask for help