| Construction cost excl. VAT | Building activity fee |
|---|---|
| € 10 000 | € 78 |
| € 25 000 | € 186 |
| € 50 000 | € 366 |
| € 100 000 | € 726 |
| € 250 000 | € 1 776 |
| € 500 000 | € 3 441 |
a. indien de bouwkosten minder dan € 10.000 bedragen: 0,78% van de bouwkosten; met een minimum van: € 36,00 b. indien de bouwkosten € 10.000 tot € 150.000 bedragen: € 6,00 vermeerderd met: 0,72% van de bouwkosten; c. indien de bouwkosten € 150.000 tot € 300.000 bedragen: € 51,00 vermeerderd met: 0,6Source: Tarieventabel behorende bij de Legesverordening Westland 2026, Artikel 2.5. read on 2026-10-13. Reliability: verified on the source.
If your plan also needs a check against the environment plan, a separate fee usually applies. The municipality sets the final amount in its decision; this page is not a decision of the municipality.
Skip or container on the street in Westland: permit needed?
Describe your job in plain words. AstraNL structures the request and looks for an executor. There is no confirmed tradesperson or price for you yet.
Ask for help