| Construction cost excl. VAT | Building activity fee |
|---|---|
| € 10 000 | € 214 |
| € 25 000 | € 214 |
| € 50 000 | € 339 |
| € 100 000 | € 652 |
| € 250 000 | € 1 552 |
| € 500 000 | € 2 922 |
a. indien de bouwkosten minder dan € 50.000,00 bedragen 0,6780% van de bouwkosten, met een minimum van: € 213,80 b. indien de bouwkosten € 50.000,00 of meer bedragen, doch minder dan € 200.000,00 € 339,00 vermeerderd met: 0,626% van het bedrag waarmee die bouwkosten € 50.000,00 te boven gaan c. indiSource: Tarieventabel behorende bij de Legesverordening Roosendaal 2026, Artikel 2.5. read on 2026-10-13. Reliability: verified on the source.
If your plan also needs a check against the environment plan, a separate fee usually applies. The municipality sets the final amount in its decision; this page is not a decision of the municipality.
Skip or container on the street in Roosendaal: permit needed?
Describe your job in plain words. AstraNL structures the request and looks for an executor. There is no confirmed tradesperson or price for you yet.
Ask for help