Get a handover confirmed
Record that the work is finished and what is still open, and let the client confirm with one tap.
Get a handover confirmedWhen it helps
On the day you hand over the work. Walk around together, note what is fine and what still has to be done.
What to write down
What was handed over, on which date, and which points are still open, with a deadline.
What a confirmation is
The other side opens your link and taps yes or no. You both see on the same link what was answered and when. It is evidence that someone with the link confirmed. It is not a signature and not an identity check.
Examples
Bathroom handed over on 14 November. Open point: sealant edge at the shower, repaired on Friday.
Move completed, all boxes delivered, no damage reported during unloading.